Technological tasks
The Tech-tasks module is tasks related to the development, implementation and improvement of new technologies, products and processes. If you have development, implementation and other needs you can post information below.
Optimization of existing methods of combating complications and the introduction of advanced technologies to minimize the impact of negative factors during hydrocarbon production
The formation of chloride salts on underground equipment, corrosion processes under the influence of aggressive environments, as well as clogging with mechanical impurities, which leads to a decrease in the overhaul period.
Making decisions before ...
до 30.04.24
Область задачи
New production technologiesNumber of applications
0
Replacing a leaking valve on a well without capping it
The well operates in a flowing manner and it is not advisable to stop it and cap it to repair the valve, because well then maybe will not return to its previous mode.
Making decisions before ...
до 30.04.24
Область задачи
New production technologiesNumber of applications
0
Unproductive operation of a gas turbine station
The station is loaded at 1/3 of its capacity due to the lack of sales of excess electricity
Making decisions before ...
до 30.04.24
Область задачи
New production technologiesNumber of applications
0
Maintaining and increasing low reservoir pressure, below saturation pressure
During production, reservoir pressure began to decrease as fluid withdrawal increased. The pressure dropped below the saturation pressure of oil with gas, as a result of which gas began to be released from the oil in the reservoir, and therefore the gas factor in production wells increased (unwanted gas production has increased).
Making decisions before ...
до 30.04.24
Область задачи
New production technologiesNumber of applications
1
Control of solid impurities during water preparation and injection
To maintain reservoir pressure (RPM), water order is used, initially technical water from water intake wells of the Albsenomanian horizon. Due to the increase in water cut in wells, the commercial water separated from the oil is purified at a water treatment plant and pumped through the RPM system into the formation. When pumping mixed technical and produced water, iron oxide sediment occurs, which leads to a discrepancy between the quality of water for flooding and the requirements of ST RK 1662-2007: The existing technological scheme of water treatment at the installation cannot ensure the appropriate water quality in accordance with the requirements of ST RK 1662-2007 (by content of mechanical impurities and petroleum products)
Making decisions before ...
до 30.04.24
Область задачи
New production technologiesNumber of applications
0
Cooling of gas and solutions using air coolers
In summer, all air-cooling devices work ineffectively. The technological regime disruptes and requires high water consumption. At the required temperature of 40 degrees, even with maximum operation of the cooling systems, the temperature is 50 degrees, which affects the operation of the compressors and their overheating. In general, this occurs during a very hot period; the cooling systems are fully loaded for about 25 days a year. Water consumption per day reaches 50-60 cubic meters per day if 4 compressors are running at once.
Making decisions before ...
до 30.04.24
Область задачи
New production technologiesNumber of applications
0
Reducing СО2 emissions into the atmosphere
According to the LCDP (Low-Carbon Development Program), it is necessary to reduce СО2 emissions into the atmosphere as a whole in the preparation workshop and gas processing.
Making decisions before ...
до 30.04.24
Область задачи
New production technologiesNumber of applications
2
Reducing high noise levels at the Sulfur Recovery Plant
When preparing gas at a sulfur recovery plant, there is a low consumption of acid gas from the design data, calculated at 4% hydrogen sulfide. Actual content is about 2.5%, while the equipment does not have motor frequency control, which leads to energy costs and creates high noise from the release of excess air from the blower. There is also increased wear and tear on equipment due to incomplete installation load. Approximately 60-65% of the supplied air is released into the atmosphere. The blower flow meter is set to 5000 cubic meters per hour.
Making decisions before ...
до 30.04.24
Область задачи
New production technologiesNumber of applications
3