Technological tasks
The Tech-tasks module is tasks related to the development, implementation and improvement of new technologies, products and processes. If you have development, implementation and other needs you can post information below.
AI-predictive analytics system for player churn in a mobile game
The company is developing an idle tycoon mobile game with tens of thousands of active users. The current analytics system records only the fact of a player's departure after the fact, which makes it impossible to respond in a timely manner to a decrease in engagement. The lack of an early churn prediction tool leads to a loss of users who could be retained with personalized offers or content.
Decision acceptance deadline
24.12.25 (inclusive)
Preferred systems
Neurotechnology and artificial IntelligenceNumber of applications
2
Power supply optimization system
We are engaged in custom design of electronics for voltage optimization systems aimed at improving energy efficiency in three-phase AC networks. Our developments are designed for a voltage from 72 to 2500 kV and are based on the architecture of an autotransformer with taps. Each unit is equipped with its own power electronics and a control system that controls two-position thyristors at the intersection of the zero current of the AC sine wave in each phase.
Decision acceptance deadline
25.12.25 (inclusive)
Preferred systems
Energy conversion and storageNumber of applications
2
Automated generation of 400 videos using artificial intelligence technologies
The goal of the project is to develop and implement an automated video content creation process that allows AI to generate 400 videos in a single format. The task includes script generation, voice acting, visuals, and automated editing. The implementation of the project will significantly speed up the production of media materials, reduce the burden on the team and ensure stable quality of content when scaling.
Decision acceptance deadline
25.12.25 (inclusive)
Preferred systems
Neurotechnology and artificial IntelligenceNumber of applications
2
Development of a generative development frontend module in the ZEON system
It is required to develop a frontend module of the ZEON platform, which ensures user interaction with the generative development system. The module should provide interfaces for creating, editing, and managing projects, visualizing architecture, generating code, configuring neural network parameters, and monitoring results. The frontend should be high-performance, modular, and adapted to complex IT system development scenarios.
Decision acceptance deadline
23.12.25 (inclusive)
Preferred systems
Neurotechnology and artificial IntelligenceNumber of applications
2
Zeon AI (QA)
It is necessary to develop a module of the ZEON platform that automates the process of preparing and updating documentation created by quality specialists (QA). The module should analyze the input requirements, generate standardized QA artifacts and ensure their further updating when the product logic changes.
Decision acceptance deadline
23.12.25 (inclusive)
Preferred systems
Neurotechnology and artificial IntelligenceNumber of applications
2
Pasport ID
Checking for vulnerabilities in Android and iOS mobile applications.
Decision acceptance deadline
23.12.25 (inclusive)
Preferred systems
Processing and storage of Big DataNumber of applications
1
AUTOMATED SYSTEM "UNIFIED OPERATIONAL MANAGEMENT PLATFORM
The system is designed to automate the management of the operations of the railway workshop of the enterprise (taking into account the divisions: _______). The main purpose of the system is to provide the collection and processing of data on the movement of trains and wagons, the planning of shunting movements, accounting for the work of the locomotive fleet and wagon service, as well as the formation of appropriate schedules and reports. The system should provide a single modern interface for performing these functions, increasing operator convenience and reducing the number of data entry errors.
Decision acceptance deadline
23.12.25 (inclusive)
Preferred systems
Smart Field Information SystemsNumber of applications
3
Looking for a partner (development specialist) for a medical startup
Good afternoon, everyone! My name is Meiram, I'm a doctor, at the launch stage of the project. Right now, I'm looking for a partner (from Astana) who, together with me, could implement the technical part. I have implemented the patent, trademark and other preparatory stages.
Decision acceptance deadline
23.12.25 (inclusive)
Preferred systems
Robotics components and sensoricsNumber of applications
4
Intelligent prompting system for the operator (Real-time Agent Assist)
To develop a module that translates the speech of the client and the operator into text in real time (ASR), analyzes the context of the dialogue and automatically displays on the operator's screen a relevant article from the Knowledge Base or a ready-made response script (LLM generation) before the operator starts searching for information manually.
Decision acceptance deadline
23.12.25 (inclusive)
Preferred systems
Information processing and transformationNumber of applications
7
Development of the interbank payment system BankPayment for clearing operations of banks
It is required to develop and implement a specialized BankPayment payment system designed to provide highly loaded processing of non-cash transfers and clearing operations between banks.
Decision acceptance deadline
23.12.25 (inclusive)
Preferred systems
Information processing and transformationNumber of applications
1