Technological tasks
The Tech-tasks module is tasks related to the development, implementation and improvement of new technologies, products and processes. If you have development, implementation and other needs you can post information below.
Comprehensive geodynamic monitoring of the territory of the Shagyrly-Shomyshty gas field using ground-based space methods
Ensuring the geodynamic safety of the development of the Shagyrly-Shomyshty field by a ground-based space surveillance system.
Decision acceptance deadline
06.08.25 (inclusive)
Preferred systems
Positioning SystemsNumber of applications
1
Техническое задание на создание автоматизированной системы обработки данных с промышленных дронов для расчета геомеханических и структурных параметров 1. Общие сведения 1.1. Полное наименование и условное обозначение системы: o Полное наименование: Автоматизированная система обработки данных с промышленных дронов для расчета геомеханических и структурных параметров пород с целью повышения качества результатов буровзрывных работ (АС ОБДПД). o Условное обозначение: АС ОБДПД.
2.2. Objectives of the system creation: o Optimization of drilling and blasting operations. o Ensuring the stability of the sides of the quarries. o Improving the overall efficiency and safety of mining operations. o Automated calculation of the area distributions of geomechanical parameters (crack density (FF), rock quality index (RQD)) and geometry (dimensions and orientation) of undisturbed fragments of a mountain range on 2D photographs. o Creation of 3D voxel models of geomechanical parameters FF and RQD based on 3D reconstructions of the sides of the quarry provided by the Customer. • Calculation module for obtaining images of geomechanical parameters (FF and RQD) and geological (parameters of undisturbed rock fragments) based on 2D photographs from a drone. • Calculation module for creating 3D voxel FF and RQD models based on point clouds obtained from 3D reconstruction of the sides of the quarry, performed by the Customer. • A set of operational documentation. • The act of conducting pilot tests and the conclusion on the effectiveness of the developed software. • A progress report prepared in accordance with GOST 7.32-2017.
Decision acceptance deadline
06.08.25 (inclusive)
Preferred systems
Geological and physical research methodsNumber of applications
4
Terms of reference for the work/provision of services for the installation and maintenance of an automated monitoring system for pollutants in atmospheric air in real time at the border of the sanitary protection zone of the GOK Aksu Kvartsitovy Gorki Akmola region of JSC "AK Altynalmas"
Installation and maintenance of an automated monitoring system for pollutants in atmospheric air in real time at the border of the sanitary protection zone of the GOK Aksu Kvartsitovy Gorki, Akmola region, JSC AK Altynalmas.
Decision acceptance deadline
30.07.25 (inclusive)
Preferred systems
Environmental monitoringNumber of applications
1
Terms of reference for the work/provision of services for the installation and maintenance of an automated monitoring system for pollutants in atmospheric air in real time at the border of the sanitary protection zone of the GOK Aksu Akmola region of JSC "AK Altynalmas"
Installation and maintenance of an automated monitoring system for pollutants in atmospheric air in real time at the border of the sanitary protection zone of the GOK Aksu Akmola region of JSC "AK Altynalmas".
Decision acceptance deadline
30.07.25 (inclusive)
Preferred systems
Environmental monitoringNumber of applications
1
Terms of reference for the work/provision of services for the installation and maintenance of an automated monitoring system for pollutants in atmospheric air in real time at the border of the sanitary protection zone of GOK Zholymbet, Akmola region, JSC "AK Altynalmas"
Installation and maintenance of an automated monitoring system for pollutants in atmospheric air (ASM-01-20A) in real time at the border of the sanitary protection zone of GOK Zholymbet, Akmola region, JSC "AK Altynalmas".
Decision acceptance deadline
30.07.25 (inclusive)
Preferred systems
Environmental monitoringNumber of applications
1
Development and implementation of digital platform elements at the Komsomolskoye field, taking into account the principles of environmental, social and corporate responsibility (ESG)
Online access to monitoring and control of technological parameters of gas lines at the production facilities of the Komsomolskoye field (flare installations, installations designed to use crude gas for their own technological needs, reverse injection of gas) providing for the development and implementation of a digital platform. The complex of works related to the development and implementation of the Digital Platform includes: 1) Construction and implementation of an automated accounting system for gas condensate and crude gas in accordance with the regulations of the legislation of the Republic of Kazakhstan, which ensures the collection, processing, transmission and storage of data on volumes and parameters of products. 2) Remote monitoring of the operation of geographically dispersed technological equipment from a single remote dispatch center (automated workplace (AWP) dispatcher, AWP specialists), as well as centralized data collection from technological facilities. 3) Archiving of current technological information for each facility for subsequent use for analysis and formation of accounting documentation. 4) Integration with the ISUNG ME RK system.
Decision acceptance deadline
30.07.25 (inclusive)
Preferred systems
Intelligent control systemsNumber of applications
2
Research of potential sources of raw materials and development of technology for obtaining isotopes for medical purposes
The purpose of this research and development (R&D) is to develop a technology for producing 226Ra (the 226th isotope of radium) for medical purposes. Radium isotopes have important applications in the treatment of various forms of cancer, and can also be used in other medical procedures. The project includes a study of potential sources for the extraction of these isotopes, an assessment of their potential, and the development of an efficient production process.
Decision acceptance deadline
06.08.25 (inclusive)
Preferred systems
New production technologiesNumber of applications
0
Optimization of mining operations using digital twins
Determination of the set of optimal mining contours depending on the market price of a mineral resource using specialized software tools.
Decision acceptance deadline
18.07.25 (inclusive)
Preferred systems
New production technologiesNumber of applications
2
Performing research and development work on the topic: "Study of structural features for monitoring the sides of a quarry based on 3D laser scanning using a drone"
1. Ensuring safe mining operations. 2. Creation of a monitoring system based on 3D laser scanning using UAVs. 3. Research and monitoring of the sides of the quarry with the study of its structural features.
Decision acceptance deadline
15.07.25 (inclusive)
Preferred systems
Geological and physical research methodsNumber of applications
2
performing research and development work (R&D) on the development and testing of a digital methodology for long-term planning of open-pit mining operations to optimize the field development strategy
• Improving the efficiency of the strategy for the development of the mineral resource base, reducing the time required to create a mining development model by 70% compared to the method used; • Development and testing of a scientifically based strategic planning methodology based on digital modeling and algorithmic optimization (increasing the accuracy of excavation volume calculations by 90% compared to manual calculation, increasing the accuracy of copper content forecasting by 80% compared to manual calculation%; • Carrying out technical and economic calculations to identify optimal operating parameters.
Decision acceptance deadline
11.07.25 (inclusive)
Preferred systems
Digital twinsNumber of applications
4