Technological tasks
The Tech-tasks module is tasks related to the development, implementation and improvement of new technologies, products and processes. If you have development, implementation and other needs you can post information below.
A project to create a VR simulator for learning how to work safely in a career
Development of a virtual simulator for practical training and skills development in a secure digital environment, in order to improve the skills of specialists, minimize risks during training and improve the level of training in conditions close to reality. Create a VR simulator that allows users to undergo interactive training in a virtual environment, including standard and emergency situations, with realistic visualization and interaction logic. The simulator should provide an opportunity to monitor and evaluate the student's actions, adapt to various scenarios and requirements of the technical task. With the possibility of providing technical support at the Customer's location.
Decision acceptance deadline
02.07.25 (inclusive)
Preferred systems
Virtual and augmented reality technologiesNumber of applications
5
The digital platform of the chemical plant of KazAzot JSC
The aim of the project is the digital transformation of the KazAzot chemical plant and its production processes by creating a single digital platform. The platform includes 3D visualization, a digital map of engineering networks, interactive analytical modules, a mobile application and integration with video surveillance systems. The system is designed to increase transparency, efficiency and efficiency of management, as well as to enhance security and control over the company's infrastructure.
Decision acceptance deadline
02.07.25 (inclusive)
Preferred systems
Information processing and transformationNumber of applications
7
Gaz Brown
Development and implementation of technology for the production of Brown's Gas (HHO) for subsequent use in industrial or domestic purposes
Decision acceptance deadline
02.07.25 (inclusive)
Preferred systems
Other technological solutionsNumber of applications
3
Development of effective methods for monitoring, preventing and eliminating ice formation on high-voltage lines
Development of effective methods for monitoring, early warning and elimination of ice formation on 110-500 kV high-voltage power transmission lines.
Decision acceptance deadline
30.06.25 (inclusive)
Preferred systems
Other technological solutionsNumber of applications
2
Digital Deposit
Integration of application applications for regulating the development of an oil and gas field, using AI.
Decision acceptance deadline
30.06.25 (inclusive)
Preferred systems
Labor protection, industrial safety, environmental protection and production operationsNumber of applications
5
Development of technical methods to reduce the loss of electricity during its transportation over long distances
In "KEGOC" JSC, the actual losses of electricity on overhead lines are within acceptable limits. At the same time, in 2024, the Company's expenses for compensation of electric energy losses increased compared to last year.
Decision acceptance deadline
30.06.25 (inclusive)
Preferred systems
Energy conversion and storageNumber of applications
1
Reducing excess emissions of pollutants into the atmosphere from heating furnaces during the combustion of crude gas in combustion furnaces and ways to solve this issue.
In the technological process of oil preparation and transportation in the fields, associated oil heaters are used, the main fuel of which is crude associated petroleum gas (not prepared) which leads to the following consequences: - high wear of technological equipment and a sharp reduction in MCI due to floating parameters of APG and the content of fatty fractions with high combustion temperatures -changes in the composition (fat content) of gas and its physico-chemical properties (moisture content of harmful impurities) leads to an unstable gas combustion system and changes in the parameters of emissions of harmful substances into the atmosphere - the use of unprepared APG with gorenje with floating parameters in terms of composition and FCS, it leads to high energy consumption for heating oil, etc.
Decision acceptance deadline
30.06.25 (inclusive)
Preferred systems
Raw material processing technologiesNumber of applications
0
Selection of equipment and technology for the preparation of process fluid for oil desalination.
It is necessary to calculate the standards of the PDS
Decision acceptance deadline
30.06.25 (inclusive)
Preferred systems
Raw material processing technologiesNumber of applications
0
Selection of equipment and technology using chemicals for wastewater treatment according to the requirements of ST RK 1627-2007
The technology of water treatment requires technological changes related to oil production and changes in the composition of the water contained in it, as well as the cumulative effect of the use of water with a high salt content and an increase in the concentration of mineral components in the PPD system.
Decision acceptance deadline
05.06.25 (inclusive)
Preferred systems
Other technological solutionsNumber of applications
0
Investigation of increasing the efficiency of pumping equipment in the uranium industry
The aim of this project is to develop and implement protective and functional coating technologies that increase corrosion resistance and reduce wear on parts. In particular, the use of modern methods of gas thermal spraying, which will increase the service life of the pump bodies, reduce the frequency of their replacement and reduce maintenance costs.
Decision acceptance deadline
04.06.25 (inclusive)
Preferred systems
New production technologiesNumber of applications
2