Problem description

The technological regime of the entire workshop is disrupted, there is a large consumption of water for cooling, additional energy resources are required, and the housings of air-cooling units are corroded. The scope of the problem includes all gas preparation cycle, and wear of all key equipment components increases.

Expected effect

The cooling system should effectively cover 6 units of cooling compressors in each 2-3 units (compressors). It is also necessary that it cools the amine gas purification unit (1 unit) and the solution unit (1 unit), as well as propane cooling unit.

Full name of responsible person

Е. Mazbaev

Contacts of responsible person

77715162451

Purpose and description of task (project)

In summer, all air-cooling devices work ineffectively. The technological regime disruptes and requires high water consumption. At the required temperature of 40 degrees, even with maximum operation of the cooling systems, the temperature is 50 degrees, which affects the operation of the compressors and their overheating. In general, this occurs during a very hot period; the cooling systems are fully loaded for about 25 days a year. Water consumption per day reaches 50-60 cubic meters per day if 4 compressors are running at once.