Price: 0
Number of applications: 0
14.10.24 (inclusive)
Contractual
Idea
R&D Tasks
Extraction and processing of hydrocarbons raw materials
Other technological solutions
Software/ IS
The use of Volga water entails penalties for pumping without calculating the norms of the MPC, as well as solving the "Water issue of the Republic of Kazakhstan"
Development of a digitalization system for technological processes that reduce the rejection of Volga water consumption in order to achieve the performance of process fluids Search for alternative methods of obtaining fresh water in case of excess heat and electric energy in the field
E. Mazbaev
Purpose and description of task (project)
the use of fresh water for production needs and, as a result, water that has changed its original properties is wastewater and it is necessary to calculate the standards of the MPD.