The melting department MV 07 PC No. 4 unit includes a melting furnace, a loading/dosing system for charge materials, sensors for monitoring flow, pressure, cooling water temperature, monitoring the temperature of the lining and hearth of the furnace, and a system for regulating the power of the electric mode of the furnace. There is no technical solution for automated analysis of downtime of the main technological equipment of melting furnaces (loading, conveyors, power control), and the final calculation of productivity.
technical solution for automated analysis of downtime of the main technological equipment of melting furnaces (loading, conveyors, power control), final calculation of productivity.
Сауя Сейпенова
87028899666
Purpose and description of task (project)
Development of a digital simulation model of the technological process of workshop 4. Calculate scenarios for production volumes depending on changes in technological parameters.