Making decisions before ...

03.05.24

Form of award

For IT companies whose solutions/MVPs are recognized by the Expert Commission as the best - conclusion of an agreement for the implementation of the presented IT solution.

Product status

Idea

Тип задачи

Задачи НИОКР

Сфера применения

Metallurgical industry

Область задачи

New production technologies

Type of product

Software/ IS

Problem description

The melting department MV 07 PC No. 4 unit includes a melting furnace, a loading/dosing system for charge materials, sensors for monitoring flow, pressure, cooling water temperature, monitoring the temperature of the lining and hearth of the furnace, and a system for regulating the power of the electric mode of the furnace. There is no technical solution for automated analysis of downtime of the main technological equipment of melting furnaces (loading, conveyors, power control), and the final calculation of productivity.

Expected effect

technical solution for automated analysis of downtime of the main technological equipment of melting furnaces (loading, conveyors, power control), final calculation of productivity.

Full name of responsible person

Сауя Сейпенова

Contacts of responsible person

87028899666

Purpose and description of task (project)

Development of a digital simulation model of the technological process of workshop 4. Calculate scenarios for production volumes depending on changes in technological parameters.