Only RK

Price: 0

Number of applications: 0

Making decisions before ...

30.04.24

Form of award

negotiable

Product status

Idea

Тип задачи

Задачи НИОКР

Сфера применения

Chemical and petrochemical industry

Область задачи

New production technologies

Type of product

other

Problem description

If to cap a well with liquid, loss of high fountain inflow is possible.

Expected effect

It is necessary to repair the valve without capping a flowing well with a current oil flow rate of 33 tons/day. Wellhead pressure Rtr-80atm., Rztr- 96atm.

Full name of responsible person

Е. Mazbaev

Contacts of responsible person

77715162451

Purpose and description of task (project)

The well operates in a flowing manner and it is not advisable to stop it and cap it to repair the valve, because well then maybe will not return to its previous mode.