Develop a system for diagnosing and predicting gas waste clogging
Propose a rational engineering solution.
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Develop a system for measuring ore residues at the ore warehouse of the Aktobe Ferroalloy Plant (as well as finished products and slag).
Develop a system for measuring ore residues at the ore warehouse of the Aktobe Ferroalloy Plant (as well as finished products and slag).
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
1
Autonomous transport
Automated vehicle control performed without a driver using optical sensors, radar and computer algorithms. Development of a list of initiatives for the introduction of unmanned or remotely controlled technological and auxiliary vehicles/equipment.
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Additional drying of fuel gas
At the gas preparation site of the field, after amine gas purification, the gas is humidified, which is used for fuel needs of compressor engines. Due to the high moisture content in the mixture, engine parts (valves, cylinders) fail. In this regard, additional drying of the gas is required.
Making decisions before ...
до 25.06.24
Область задачи
Energy conversion and storageNumber of applications
0
Propose a solution for predicting pressure surges on furnaces
Aktobe Ferroalloy Plant, Melting Shop №4
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Hub Perks
Predictive determination of the condition of furnace linings and determination of residual life
Propose a rational engineering solution.
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Hydraulic calculation of oil and gas collection system
The system for collecting and transporting oil and gas in the field at the current production capacity requires recalculation of the hydraulic parameters of the system. There is a discrepancy between the initial design data of the oil and gas collection system and the actual performance of the system. As a result, the collection system installations operate inefficiently and energy resources are wasted. It is necessary to recalculate the system in terms of pressure, throughput, diameters, pressure losses
Making decisions before ...
до 25.06.24
Область задачи
Intelligent control systemsNumber of applications
0
Modeling the impact of production on the environment
Development of a digital simulation model linking production processes to emissions. Carry out calculations and search for the optimal scenario depending on changes in process parameters.
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
1
Implement a digital queue when selling crushed stone
Currently, there are congestions at the weighing station and at the launch of contractors' vehicles at the checkpoint, and the accumulation of contract vehicles in front of the checkpoint near the plant territory. To speed up the process of selling crushed stone, automation is necessary
Making decisions before ...
до 03.05.24
Область задачи
Technologies in transport and logisticsNumber of applications
0
Решить вопрос обводненности
Решение вопроса обводненности
Making decisions before ...
до 16.07.24
Область задачи
Energy conversion and storageNumber of applications
1
Develop a solution for dust aspiration/collection at the facilities of the 4th workshop of the Aktobe Ferroalloy Plant
In the smelting shop No. 4 of the Aktobe Ferroalloy Plant, there is currently a problem with cleaning up spills of charge materials and dust, which leads to shutdowns of process equipment and the involvement of additional personnel. It is necessary to develop a solution for dust aspiration/collection at the facilities of the 4th workshop
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Develop a solution to prevent railway vehicles from colliding with each other
Location - Aktobe Ferroalloy Plant, Aktobe railway tracks (ZhDC). Internal transportation of ferroalloy ingots between the smelting shops and the finished product warehouse, as well as other materials, is carried out by the enterprise's railway. The speed of the train is no more than 7 km/h, transportation is carried out accompanied by technical personnel. Internal railway crossings are not equipped with barriers/barriers. Sometimes minor collisions between vehicles and trains occur. A solution needs to be developed to prevent rail vehicles from colliding with each other.
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Leakage of coolant from the furnace roof located under the concrete
Develop a solution for detecting coolant leaks from furnace roofs located under concrete.
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
To propose a solution for increasing the wear resistance of the gate valve in the charge processing department, processing department and finished product shipment
Aktobe Ferroalloy Plant, Melting Shop No. 4 (charge preparation area, finished product area), Central FiofiOF To propose a solution for increasing the wear resistance of the gate valve in the charge processing department, processing department and finished product shipment
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Develop a prototype crawler robot
Conducting inspection and remote monitoring of equipment condition using a crawler robot.
Making decisions before ...
до 03.05.24
Область задачи
Intelligent control systemsNumber of applications
0
Digital model of workshop 4 with shutdowns and calculation of design productivity
Development of a digital simulation model of the technological process of workshop 4. Calculate scenarios for production volumes depending on changes in technological parameters.
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Интеграция протоколов QuickFix и WebSocket
It is necessary to make an advisor capable of copying transactions from Binance/ByBit to MT5 using the API, or offer a solution to this problem in another accessible way. We need to copy trades from the exchange to PAMM in MT5 (USDT futures contracts).
Making decisions before ...
до 08.07.24
Область задачи
ФинтехNumber of applications
0
Sludge deposits on the water-cooled channels of furnace elements during scheduled repairs of furnaces
To propose a solution for diagnosing and predicting the occurrence of sludge deposits on the water-cooled channels of furnace elements (short network, main pipes for supplying coolant).
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Develop a solution to prevent ore material from “hanging” in bunkers
At a certain period, to summarize the balance of the metal, surveyors carry out work to measure the “bed”. The measurement is carried out by weighing the ingots with screenings, and the “bed” is also measured separately after collecting the ingots. As a result, the amount of adhering screenings is subtracted from the initial values of the made “bed” before releasing the metal. The task is to automate the entire process
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Using waste-free gas purification technology
When purifying gas from hydrogen sulfide, the alkaline cleaning method is used. At the same time, there are large costs for servicing expensive equipment designed for alkaline cleaning, costs for energy resources, chemical reagents and disposal of waste alkali. NaOH alkali is used, which requires the use of expensive equipment. The alkali requirement reached a maximum of 600 liters per hour
Making decisions before ...
до 25.06.24
Область задачи
Raw material processing technologiesNumber of applications
0