Technological tasks
The Tech-tasks module is tasks related to the development, implementation and improvement of new technologies, products and processes. If you have development, implementation and other needs you can post information below.
Laboratory Assistant System
The laboratory assistant system is designed to support laboratory technicians in providing clear and up-to-date instructions on performing laboratory procedures, familiarizing them with the latest changes in regulatory documents and standards, familiarizing them with safety regulations and requirements, helping them prepare their workplace in accordance with safety standards, monitoring the sequence of work processes in the laboratory, and informing them on the correct use of laboratory equipment. handling laboratory equipment, informing about possible errors in working with laboratory equipment and reagents and ways to prevent them, accompanying newly appointed employees during familiarization with the work, providing background information on reagents, consumables and equipment; assistance in maintaining laboratory journals and filling out forms, as well as support in promptly explaining regulations, statuses analyses and organizational procedures. Development of the institution's digital contour through the introduction of a local server infrastructure optimized for LLM models, AI modules, and the use of a bare metal approach within the institution's closed network.
Decision acceptance deadline
12.05.26 (inclusive)
Preferred systems
Neurotechnology and artificial IntelligenceNumber of applications
7
Research and optimization of mathematical model of aerodynamics for flight simulators
В рамках развития программных решений для авиасимуляторов и авиационных тренажеров компания KYC Company проводит исследование и анализ подходов к повышению точности и производительности математических моделей летательных аппаратов. Цель проекта — определить оптимальные методы моделирования, которые обеспечат стабильную работу в реальном времени и возможность масштабирования под различные типы воздушных судов.
Decision acceptance deadline
06.05.26 (inclusive)
Preferred systems
Unmanned aerial vehiclesNumber of applications
4
ZEON Module: AI-candidate selection and scoring
Objective: To develop an intelligent AI candidate selection and scoring system to automate the initial selection process, improve the quality of hiring and reduce the operational burden on HR. Project Description: The project aims to create an AI module that automatically analyzes candidates' resumes, compares them with job requirements, and assigns a scoring (compliance assessment) to each candidate. The system uses natural language processing (NLP) methods, embeddings, and LLM models to: analyze unstructured data (resume, description of experience); extract skills, experience, and key characteristics of a candidate; match with job requirements; and generate explicable AI. The result of the system is a ranked list of candidates with an assessment and explanations, available through the API for integration into CRM/ATS.
Decision acceptance deadline
05.05.26 (inclusive)
Preferred systems
Intelligent control systemsNumber of applications
13
Разработка цифровой платформы «Единый портал поддержки бизнеса» (ЕППБ) на базе универсального конструктора
The ultimate goal: To create a design platform for automating 70+ support measures for the Holding and content pages. A Technical Specification is attached in the attachment as a guideline for the final, target system. The task of the hackathon (MVP): To develop the core of the platform, the key element of which is the no-code/low-code constructor of forms and business logic. The teams need to prove the viability of their designer by setting up a complex two-stage service in it: "Purchase of air transport and wagons for leasing" (stages I and II: https://bgov.kz/services/wagons_ind and https://bgov.kz/services/wagons_exp ) IMPORTANT: The implementation of the service "in code" (hardcode) without using the designer's tools will be considered a failure to complete the task. The leasing service is a test case to test the flexibility of your engine.
Decision acceptance deadline
05.05.26 (inclusive)
Preferred systems
Other technological solutionsNumber of applications
24
Implementation of a real-time situational map
Создать единое окно для оперативного мониторинга деятельности организации в реальном времени. Обеспечить автоматические цветовые индикаторы (зелёный / жёлтый / красный) по ключевым показателям. Реализовать механизм заметок: при красном индикаторе руководитель Управления может оставить заметку, которая мгновенно становится видна ниже стоящему руководителю. Сократить время на сбор отчётности и повысить оперативность принятия управленческих решений. Обеспечить иерархическую систему доступа и высокий уровень информационной безопасности.
Decision acceptance deadline
04.05.26 (inclusive)
Preferred systems
Intelligent control systemsNumber of applications
9
Data normalization and validation platform for AI and analytical projects
We are looking for a developer or a team to create a solution that will allow us to bring incoming data to a single format, conduct initial validation, find duplicates and inconsistencies, and prepare data for further use in analytical and AI projects. The platform should support downloading data from various sources, basic rules for cleaning and normalization, change control, and convenient work with an internal team.
Decision acceptance deadline
01.05.26 (inclusive)
Preferred systems
Processing and storage of Big DataNumber of applications
11
Quality control system and routing of data preparation tasks
We are looking for a team or developer to design and create a software solution that will help automate the processes of data preparation and quality control within the company. The solution should allow tasks to be distributed among performers, record execution statuses, conduct two-stage verification, account for errors, and collect quality statistics. It is important that the system supports working with different types of data, differentiating user roles, and reporting to the team.
Decision acceptance deadline
01.05.26 (inclusive)
Preferred systems
Processing and storage of Big DataNumber of applications
9
Assignment for the development of the "Worklogs" module for a web application
Develop a module for storing, displaying, and analyzing work activity records (worklogs). The module should provide an API for receiving, storing, and receiving worklogs filtered by date, project, and user, as well as display activity statistics in the web interface in the form of graphs and tables.
Decision acceptance deadline
27.04.26 (inclusive)
Preferred systems
Web-разработкаNumber of applications
9
Development of a scalable CRM integration module with government systems of the Republic of Kazakhstan
As part of the development of the system, it is required to develop a universal and scalable module for integration with government and external services. The goal is to ensure a seamless data exchange between the accounting system and government platforms.
Decision acceptance deadline
27.04.26 (inclusive)
Preferred systems
Intelligent control systemsNumber of applications
5
introduction of Personnel electronic document management
implementation of Personnel electronic document management in the company. The implementation of the HR Electronic Document Management (CED) project is aimed at digitalizing HR processes, reducing paper and archive costs, and speeding up document signing. The main tasks include automating the creation and approval of documents, ensuring legal relevance, protecting personal data, and increasing transparency in working with staff.
Decision acceptance deadline
23.04.26 (inclusive)
Preferred systems
Information processing and transformationNumber of applications
12