Technological tasks
The Tech-tasks module is tasks related to the development, implementation and improvement of new technologies, products and processes. If you have development, implementation and other needs you can post information below.
Assistance to the Operator of the authorized body in the field of science and higher education in monitoring and controlling the employment and training of young specialists who have studied on the basis of the state educational order and have committed to a three-year / two-year training.
1. Notifying young professionals about the need to work out by sending SMS mailings or other methods and options for notification using the latest information technologies. 2. Monitoring and control of employment and working out by the Operator by obtaining data on mandatory pension contributions and mandatory social contributions indicating the BIN and IIN of employers, actual and legal address.
Decision acceptance deadline
19.05.23 (inclusive)
Number of applications
7
Website development
Refinement of the site on the CMS, introduce new features. Development language: PHP Database type: MySQL period of 3-4 days, no more. details in the chat.
Decision acceptance deadline
03.04.23 (inclusive)
Number of applications
1
Eye protection
I have a question regarding the application or software that would control the playback of the video (let's say children's YouTube) .... when approaching less than 30 cm to the eyes, the video would pause or the screen would fade out, when the screen moved away more than 30 cm, the video would play again. Is this possible or is this idea already implemented??? If not, then you can help me to implement it. As I found out, some say. that you can't take control of products from Google, but you can create an extension for Google. Isn't it…..? And are there any sensors built into the phones that allow you to determine the distance to the face ... or will it be necessary to develop a separate device.
Decision acceptance deadline
23.03.23 (inclusive)
Number of applications
0
Site content changes
Make adjustments to the content and blocks on the site. The account is in wordpress.
Decision acceptance deadline
01.03.23 (inclusive)
Number of applications
2
Program "Safe City" Well + Manhole + Castle PROTECT HATCHES OF WELLS
The Safe City program is addressing our common problem - the loss of manhole covers and dangerous open wells, which are still increasing on the streets ... The problem of open wells now exists in almost all the republics of the former CIS and our near and far abroad England , Poland, USA, India, Bulgaria, China.
Decision acceptance deadline
03.03.23 (inclusive)
Number of applications
2
Safety and labor protection
- Personnel movement monitoring system - a personal tracker with an SOS alarm button that sends a signal to the dispatcher - A system for monitoring the proximity of an employee and equipment, signaling both the driver / operator of the equipment about the presence of a person nearby, and the employee that the equipment is nearby - DVRs for mining equipment with a large amount of memory for recording - Driver fatigue monitoring system. A camera aimed at the driver captures the moments of falling asleep, smoking, using a cell phone, and being distracted from the road. When detected, it notifies the driver himself and transmits data to the control room
Decision acceptance deadline
06.02.23 (inclusive)
Number of applications
6
Mining production
- Geodetic UAV (quadcopter) with a digital camera and lidar for aerial photography of the mine and building / updating 3D maps. The UAV must have a ground station for additional georeferencing accuracy. In general, the UAV must have performance comparable or superior to the DJI Matrice 300 RTK. - Software for building a 3D model of a mine, both based on a cloud of points and based on photogrammetry. The quality of the model obtained using photogrammetry should be high, the maximum error should be 4-6 cm. The software should have tools for mine surveying, carrying out the necessary geodetic calculations, and not just a 3D engine for visualization.
Decision acceptance deadline
23.01.23 (inclusive)
Number of applications
1
Site content changes
Make adjustments to the content and blocks on the site. The account is in wordpress.
Decision acceptance deadline
19.01.23 (inclusive)
Number of applications
4
Dispatching
- Vehicle monitoring with GPS - Calculation of work, downtime, waiting, etc. - Work order management, the ability to promptly issue a new work order - Feedback from the driver - Operational calculation of productivity both for the whole mine and individually for each vehicle/special equipment - Tire pressure monitoring with signaling to the driver and to the control room - Dashboard for tracking the progress of production with the ability to switch to more detailed information on brigades/work orders/equipment. - Heat maps for the analysis of equipment operation
Decision acceptance deadline
16.02.23 (inclusive)
Number of applications
6
Application for the Ministry of Emergency Situations
1. Keep electronic records of detour and preventive work at facilities, with the possibility of reflecting information about its conduct on the map and the possibility of comparing the reality of preventive work remotely (today we conduct a detour of every house in the capital, hand over recommendations on fire safety and fill out forms on preventive work with familiarization under painting, monitor manually passed sections); 2. Enter information about the preventive work carried out (briefings, results of inspections) and emergency incidents at the facilities of the capital (for residential buildings – a bypass briefing, a confirming photo or material, fires, for objects (for example: schools, shops, parking, etc.- information about the inspection with the application of the results of inspections, briefing, fire). 3. To introduce and maintain in the future the electronic format of operational cards and fire extinguishing plans for the objects for which they are necessarily created (annually these cards and plans need to be updated, which consumes a large amount of waste paper, efficiency is lost during their development, etc.) and characteristics for the objects to be accounted for (these characteristics have we have for each controlled object). 4. Add snow-bearing areas, as well as areas subject to flooding (we have the data) 5. Add fire hydrants (we have the data and the map)
Decision acceptance deadline
01.12.22 (inclusive)
Number of applications
4