Чтобы превратить идею в реальный бизнес или масштабировать стартап в стабильную компанию, нужны немалые деньги. Иногда для этого недостаточно своих накоплений, и поэтому вам помогут инвестиции. Инвест
Development of your own transport modeling software
Develop software for transport engineers to simulate street traffic (road traffic) with predicting driver behavior. This solution is necessary for research work to assess the impact of traffic (comparison of several options) when changing the organization of traffic in the area (construction, reconstruction of roads, increasing, decreasing traffic lanes, adding future traffic traffic, in connection with the construction of facilities). Main indicators for assessing simulated traffic: - movement speed; - travel time; - delay time; - density of cars. There are world-wide analogues; upon introduction, we will show you how these software work.
Making decisions before ...
до 25.04.24
Область задачи
Digital twinsNumber of applications
1
Modeling the impact of production on the environment
Development of a digital simulation model linking production processes to emissions. Carry out calculations and search for the optimal scenario depending on changes in process parameters.
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
1
Leakage of coolant from the furnace roof located under the concrete
Develop a solution for detecting coolant leaks from furnace roofs located under concrete.
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Develop a prototype crawler robot
Conducting inspection and remote monitoring of equipment condition using a crawler robot.
Making decisions before ...
до 03.05.24
Область задачи
Intelligent control systemsNumber of applications
0
Develop a solution for dust aspiration/collection at the facilities of the 4th workshop of the Aktobe Ferroalloy Plant
In the smelting shop No. 4 of the Aktobe Ferroalloy Plant, there is currently a problem with cleaning up spills of charge materials and dust, which leads to shutdowns of process equipment and the involvement of additional personnel. It is necessary to develop a solution for dust aspiration/collection at the facilities of the 4th workshop
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Hub Perks
Develop a system for diagnosing and predicting gas waste clogging
Propose a rational engineering solution.
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Sludge deposits on the water-cooled channels of furnace elements during scheduled repairs of furnaces
To propose a solution for diagnosing and predicting the occurrence of sludge deposits on the water-cooled channels of furnace elements (short network, main pipes for supplying coolant).
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Digital model of workshop 4 with shutdowns and calculation of design productivity
Development of a digital simulation model of the technological process of workshop 4. Calculate scenarios for production volumes depending on changes in technological parameters.
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
To propose a solution for increasing the wear resistance of the gate valve in the charge processing department, processing department and finished product shipment
Aktobe Ferroalloy Plant, Melting Shop No. 4 (charge preparation area, finished product area), Central FiofiOF To propose a solution for increasing the wear resistance of the gate valve in the charge processing department, processing department and finished product shipment
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Теплоизоляционная покрытие
Во избежания прорывов труб
Making decisions before ...
до 26.04.24
Область задачи
New production technologiesNumber of applications
0
Develop online advisors for preparing the “bed” for casting metal according to given dimensions
Melting shop No. 4, Aktobe Ferroalloy Plant Develop online advisors for preparing the “bed” for casting metal according to given dimensions
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Automate manual extraction of ferrochrome from crushed slag in OPShl
It is necessary to automate the manual extraction of fractions 0-5, 5-20, 20-40 mm from crushed stone (slag) in PC № 4, due to the possible loss of metal-containing materials.
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Develop a system for determining the volume/weight of slag in the slag pit PC 4
Transportation of slag by dump trucks to the crushing and screening complex (DSK 600) for subsequent crushing. Weighing the volume of slag with the bowl is carried out by slag trucks; the bowl is also weighed separately by a slag truck; the difference between a bowl full of slag and an empty ladle is equal to the weight of the slag. It is necessary to automate the process of accounting for unloaded OPSH dump trucks
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Develop a solution to prevent ore material from “hanging” in bunkers
At a certain period, to summarize the balance of the metal, surveyors carry out work to measure the “bed”. The measurement is carried out by weighing the ingots with screenings, and the “bed” is also measured separately after collecting the ingots. As a result, the amount of adhering screenings is subtracted from the initial values of the made “bed” before releasing the metal. The task is to automate the entire process
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0