Technological tasks

The Tech-tasks module is tasks related to the development, implementation and improvement of new technologies, products and processes. If you have development, implementation and other needs you can post information below.

Filter
172 tasks

Study of potential sources of raw materials for the development of technology for the production of medical isotopes

1) determination of optimal sources of raw materials of radium radioisotopes from uranium production products; 2) development of technology for obtaining extraction of radium radioisotopes from industrial uranium production products; 3) determination of expediency of organization of obtaining radium radioisotopes from industrial uranium production products.

Customer

АО "НАК "КазАтомПром"

Decision acceptance deadline

30.04.24 (inclusive)

Preferred systems

Raw material processing technologies

Number of applications

1

Development of technology for production of spheroidized powders of tantalum, niobium and/or their alloys from the Customer's products

1) development of technology for production of spherical metal powders from tantalum, niobium and/or their alloys. 2) determination of feasibility of organization of industrial production of spherical metal powders from tantalum and niobium on the basis of the Customer.

Customer

АО «СП «ЗАРЕЧНОЕ» (АО "НАК "КАЗАТОМПРОМ")

Decision acceptance deadline

30.04.24 (inclusive)

Preferred systems

New production technologies

Number of applications

1

Inter-casing pressure

In one well at a certain depth there is inter-casing pressure (ICP), which can lead to collapse of the production string and the appearance of griffins.

Customer

ЦНТИ "Самгау"

Decision acceptance deadline

30.04.24 (inclusive)

Preferred systems

New production technologies

Number of applications

1

Improving the quality of treatment of injected water from water intake wells along with associated formation water in the reservoir pressure maintenance system

Contamination of the working agent with adhesive forms of sulfate-reducing bacteria (SRB), mechanical impurities, petroleum products.

Customer

ЦНТИ "Самгау"

Decision acceptance deadline

30.04.24 (inclusive)

Preferred systems

New production technologies

Number of applications

0

Optimization of existing methods of combating complications and the introduction of advanced technologies to minimize the impact of negative factors during hydrocarbon production

The formation of chloride salts on underground equipment, corrosion processes under the influence of aggressive environments, as well as clogging with mechanical impurities, which leads to a decrease in the overhaul period.

Customer

ЦНТИ "Самгау"

Decision acceptance deadline

30.04.24 (inclusive)

Preferred systems

New production technologies

Number of applications

0

Replacing a leaking valve on a well without capping it

The well operates in a flowing manner and it is not advisable to stop it and cap it to repair the valve, because well then maybe will not return to its previous mode.

Customer

ЦНТИ "Самгау"

Decision acceptance deadline

30.04.24 (inclusive)

Preferred systems

New production technologies

Number of applications

0

Unproductive operation of a gas turbine station

The station is loaded at 1/3 of its capacity due to the lack of sales of excess electricity

Customer

ЦНТИ "Самгау"

Decision acceptance deadline

30.04.24 (inclusive)

Preferred systems

New production technologies

Number of applications

0

Maintaining and increasing low reservoir pressure, below saturation pressure

During production, reservoir pressure began to decrease as fluid withdrawal increased. The pressure dropped below the saturation pressure of oil with gas, as a result of which gas began to be released from the oil in the reservoir, and therefore the gas factor in production wells increased (unwanted gas production has increased).

Customer

ЦНТИ "Самгау"

Decision acceptance deadline

30.04.24 (inclusive)

Preferred systems

New production technologies

Number of applications

1

Control of solid impurities during water preparation and injection

To maintain reservoir pressure (RPM), water order is used, initially technical water from water intake wells of the Albsenomanian horizon. Due to the increase in water cut in wells, the commercial water separated from the oil is purified at a water treatment plant and pumped through the RPM system into the formation. When pumping mixed technical and produced water, iron oxide sediment occurs, which leads to a discrepancy between the quality of water for flooding and the requirements of ST RK 1662-2007: The existing technological scheme of water treatment at the installation cannot ensure the appropriate water quality in accordance with the requirements of ST RK 1662-2007 (by content of mechanical impurities and petroleum products)

Customer

ЦНТИ "Самгау"

Decision acceptance deadline

30.04.24 (inclusive)

Preferred systems

New production technologies

Number of applications

0

Cooling of gas and solutions using air coolers

In summer, all air-cooling devices work ineffectively. The technological regime disruptes and requires high water consumption. At the required temperature of 40 degrees, even with maximum operation of the cooling systems, the temperature is 50 degrees, which affects the operation of the compressors and their overheating. In general, this occurs during a very hot period; the cooling systems are fully loaded for about 25 days a year. Water consumption per day reaches 50-60 cubic meters per day if 4 compressors are running at once.

Customer

ЦНТИ "Самгау"

Decision acceptance deadline

30.04.24 (inclusive)

Preferred systems

New production technologies

Number of applications

0

Task type

Preferred systems

Field of application

Reset filters