Description and development in program code of an algorithm for predicting equipment failure in the charge preparation department
To propose a rational engineering and technical solution for predicting failures of process equipment in the charge preparation department of PC No. 4
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Develop a prototype of a mobile metal and slag sampler
Propose a rational engineering solution. Melting shop №4, Aktobe Ferroalloy Plant
Making decisions before ...
до 26.04.24
Область задачи
Other technological solutionsNumber of applications
1
Selection of the composition of diverter technology (DT) fluids for carbonate reservoirs
Water cut in wells increases.
Making decisions before ...
до 30.04.24
Область задачи
New production technologiesNumber of applications
0
Selection of capping fluid while well repairing
Water cut in wells increases.
Making decisions before ...
до 14.05.24
Область задачи
New production technologiesNumber of applications
0
Development of your own traffic video analytics software
First of all, gathering a team, joint study and determining the necessary activities - the main thing is to start so that the developers understand the task first. Automatic counting of vehicles passing through intersections (all directions, straight, right, left, U-turn, etc.) through video of drones that film traffic movements at an altitude of 500 meters and cover several intersections. There are world-wide analogues; upon introduction, we will show you how these software work
Making decisions before ...
до 25.04.24
Область задачи
Neurotechnology and artificial IntelligenceNumber of applications
2
Hub Perks
Develop a solution to prevent railway vehicles from colliding with each other
Location - Aktobe Ferroalloy Plant, Aktobe railway tracks (ZhDC). Internal transportation of ferroalloy ingots between the smelting shops and the finished product warehouse, as well as other materials, is carried out by the enterprise's railway. The speed of the train is no more than 7 km/h, transportation is carried out accompanied by technical personnel. Internal railway crossings are not equipped with barriers/barriers. Sometimes minor collisions between vehicles and trains occur. A solution needs to be developed to prevent rail vehicles from colliding with each other.
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Develop a module to determine the degree of emptying of railcars in the charge preparation department.
Propose a rational engineering and technical solution for determining and monitoring the degree of emptying of a railcar.
Making decisions before ...
до 03.05.24
Область задачи
Intelligent control systemsNumber of applications
1
Development of an information system for KSU Center for Active Longevity in Astana
Development, maintenance and technical support of IT system - modules for process automation: - Module “Visitor and Employee Electronic Passport System”; - Module “Real-time video monitoring system”; - Module “System for electronic registration of visitors to events”; - Module “Automated system for recording and monitoring visitors through facial recognition technology.
Making decisions before ...
до 14.05.24
Область задачи
Technologies in telecommunicationsNumber of applications
1
Predictive determination of the condition of furnace linings and determination of residual life
Propose a rational engineering solution.
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Propose a solution for predicting pressure surges on furnaces
Aktobe Ferroalloy Plant, Melting Shop №4
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Watermark Remover: Development of a neural network to remove watermarks from photos
Machine learning is required to create and train a neural network that can remove watermarks from photos in the shortest possible time.
Making decisions before ...
до 25.04.24
Область задачи
New production technologiesNumber of applications
1
Implement a digital queue when selling crushed stone
Currently, there are congestions at the weighing station and at the launch of contractors' vehicles at the checkpoint, and the accumulation of contract vehicles in front of the checkpoint near the plant territory. To speed up the process of selling crushed stone, automation is necessary
Making decisions before ...
до 03.05.24
Область задачи
Technologies in transport and logisticsNumber of applications
0
Automation and robotization of manual operations
Survey and development of a list of initiatives for automation and robotization of all manual operations within the technological process of workshop 4. To propose a rational engineering and technical solution to eliminate the human factor as much as possible in the smelting of ferroalloys
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
1
Autonomous transport
Automated vehicle control performed without a driver using optical sensors, radar and computer algorithms. Development of a list of initiatives for the introduction of unmanned or remotely controlled technological and auxiliary vehicles/equipment.
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Develop a system for measuring ore residues at the ore warehouse of the Aktobe Ferroalloy Plant (as well as finished products and slag).
Develop a system for measuring ore residues at the ore warehouse of the Aktobe Ferroalloy Plant (as well as finished products and slag).
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
1
Leakage of coolant from the furnace roof located under the concrete
Develop a solution for detecting coolant leaks from furnace roofs located under concrete.
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Development of your own transport modeling software
Develop software for transport engineers to simulate street traffic (road traffic) with predicting driver behavior. This solution is necessary for research work to assess the impact of traffic (comparison of several options) when changing the organization of traffic in the area (construction, reconstruction of roads, increasing, decreasing traffic lanes, adding future traffic traffic, in connection with the construction of facilities). Main indicators for assessing simulated traffic: - movement speed; - travel time; - delay time; - density of cars. There are world-wide analogues; upon introduction, we will show you how these software work.
Making decisions before ...
до 25.04.24
Область задачи
Digital twinsNumber of applications
1
Develop a module for transferring existing mnemonic diagrams to an application available in MES and qollab
Improving the quality of equipment maintenance by increasing the efficiency of searching for objects at the production site.
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Create a 3D model of one of the sections 4 of the AktZF workshop (case for students)
Creation of a 3D model of sections of the processing center No. 4, for visual operation of the unit and personnel training.
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Modeling the impact of production on the environment
Development of a digital simulation model linking production processes to emissions. Carry out calculations and search for the optimal scenario depending on changes in process parameters.
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
1