Modeling the impact of production on the environment

Development of a digital simulation model linking production processes to emissions. Carry out calculations and search for the optimal scenario depending on changes in process parameters.

Заказчик

Сауя Сейпенова

Making decisions before ...

до 03.05.24

Область задачи

New production technologies

Number of applications

Propose a solution for predicting pressure surges on furnaces

Aktobe Ferroalloy Plant, Melting Shop №4

Заказчик

ТОО «Business & Technology Services»

Making decisions before ...

до 03.05.24

Область задачи

New production technologies

Number of applications

To propose a solution for increasing the wear resistance of the gate valve in the charge processing department, processing department and finished product shipment

Aktobe Ferroalloy Plant, Melting Shop No. 4 (charge preparation area, finished product area), Central FiofiOF To propose a solution for increasing the wear resistance of the gate valve in the charge processing department, processing department and finished product shipment

Заказчик

ТОО «Business & Technology Services»

Making decisions before ...

до 03.05.24

Область задачи

New production technologies

Number of applications

Restoring the verticality of the Incinerator (afterburner)

The verticality of the afterburner is broken. In case of strong wind, deviation from the vertical axis is observed, as well as oscillations of the flare trunk in winter at low temperatures. The fluctuation is approximately from 60 cm to 1 meter.

Заказчик

ЦНТИ "Самгау"

Making decisions before ...

до 25.06.24

Область задачи

Industrial Safety

Number of applications

Develop a solution to prevent railway vehicles from colliding with each other

Location - Aktobe Ferroalloy Plant, Aktobe railway tracks (ZhDC). Internal transportation of ferroalloy ingots between the smelting shops and the finished product warehouse, as well as other materials, is carried out by the enterprise's railway. The speed of the train is no more than 7 km/h, transportation is carried out accompanied by technical personnel. Internal railway crossings are not equipped with barriers/barriers. Sometimes minor collisions between vehicles and trains occur. A solution needs to be developed to prevent rail vehicles from colliding with each other.

Заказчик

Business & Technology Services

Making decisions before ...

до 03.05.24

Область задачи

New production technologies

Number of applications

Hub Perks

Контроль намагниченности изолированных стыков рельсов

Разработка решений для устранения намагниченности и накопления металлических частиц в изолированных стыках рельсов, чтобы предотвратить сбои в рельсовых цепях и обеспечить безопасность высокоскоростных железных дорог.

Заказчик

ЦНТИ "Самгау'

Making decisions before ...

до 26.11.24

Область задачи

Energy conversion and storage

Number of applications

Application of fiberglass pipes inside the CPP

Increased rates of wear, corrosion and deposits of the pipeline leading to a large number of leaks and accidents, large heat losses of the pipeline and high operating costs for insulation and heating, all of this leads to high operating costs, including frequent and expensive repairs leading, in addition to all, to equipment downtime. Protecting a pipeline by lining is a very expensive and short-lived process in the case of a high content of mechanical impurities and does not exclude the cost of heat loss. One of the ways to increase the efficiency of a pipeline is the use of composite pipelines, but at the moment there is no regulatory framework for the use of fiberglass pipes and fittings at CPP facilities.

Заказчик

ЦНТИ "Самгау"

Making decisions before ...

до 28.06.24

Область задачи

Labor protection, industrial safety, environmental protection and production operations

Number of applications

Predictive determination of the condition of furnace linings and determination of residual life

Propose a rational engineering solution.

Заказчик

ТОО «Business & Technology Services»

Making decisions before ...

до 03.05.24

Область задачи

Other technological solutions

Number of applications

Теплоизоляционная покрытие

Во избежания прорывов труб

Заказчик

Ангренсор Энерго

Making decisions before ...

до 26.04.24

Область задачи

New production technologies

Number of applications

Cleaning wells from proppants after hydraulic fracturing (HF)

After the operation is completed, the proppant is squeezed back into the well.

Заказчик

ЦНТИ "Самгау"

Making decisions before ...

до 16.07.24

Область задачи

Field and well development management

Number of applications

Интеллектуальная система анализа и мониторинга качества земель с применением элементов ИИ для граждан

Оценка качества почвы, рекомендации по посеву и выбору культур с интеграцией с ИС ЕГКН в части качественного состояния почвы

Заказчик

Technology Centers Astana Hub

Making decisions before ...

до 03.04.25

Область задачи

Neurotechnology and artificial Intelligence

Number of applications

Intercolumn pressure

In one well at a certain depth there is inter-casing pressure (ICP), which can lead to collapse of the production string and the appearance of griffins.

Заказчик

ЦНТИ "Самгау"

Making decisions before ...

до 16.07.24

Область задачи

Information processing and transformation

Number of applications

Digital model of workshop 4 with shutdowns and calculation of design productivity

Development of a digital simulation model of the technological process of workshop 4. Calculate scenarios for production volumes depending on changes in technological parameters.

Заказчик

ТОО «Business & Technology Services»

Making decisions before ...

до 03.05.24

Область задачи

New production technologies

Number of applications

Leakage of coolant from the furnace roof located under the concrete

Develop a solution for detecting coolant leaks from furnace roofs located under concrete.

Заказчик

ТОО «Business & Technology Services»

Making decisions before ...

до 03.05.24

Область задачи

Other technological solutions

Number of applications

Разработка и последующая модернизация системы управления бизнесом

Разработка mvp проекта система управления бизнесом (цифровая и автоматизированная система для малого и среднего бизнеса)

Заказчик

Жалбагаев Самат Ермакович

Making decisions before ...

до 14.10.24

Область задачи

Intelligent control systems

Number of applications

Research into the causes and conditions of the occurrence of TRNE (hard-to-break oil emulsion) in the field and the search for technological solutions that prevent the occurrence of TRNE, as well as the development of solutions for its destruction and further disposal. Study of the conditions for the formation of difficult-to-break oil emulsions in the field and methods of combating its formation and developing recommendations for its destruction

In the process of transport production and oil preparation in the field, the process of formation of oil emulsions occurs caused by transient dynamic processes in pipelines and the transport system, chemical processes in all technological cycles of the oil field, including those caused by conflicts of residual doses of chemical reagents in various technological cycles, transient thermodynamic preparation processes oil, and changing parameters and composition of produced oil. The emulsion that appears at different cycles due to the peculiarity of the oil composition and the content of resins and asphaltenes in it, as well as the high salinity of formation water, in combination with mechanized production and other dynamic processes of the oil field, forms TRNE at the final cycle of oil preparation in reservoirs. TRNE negatively affects the efficiency of the oil production and treatment process, and also creates additional disposal costs and environmental payments. In the course of research work, it is necessary to determine the main factors influencing the occurrence of TRNE, select or develop technologies that prevent the formation of TRNE, and develop technologies for the destruction and further processing and disposal of TRNE with a reduction in the negative impact on the environment. Determining the reasons for the formation of TRNE and developing recommendations for its destruction and recycling technologies.

Заказчик

ЦНТИ "Самгау"

Making decisions before ...

до 16.07.24

Область задачи

Field and well development management

Number of applications

Develop a solution for dust aspiration/collection at the facilities of the 4th workshop of the Aktobe Ferroalloy Plant

In the smelting shop No. 4 of the Aktobe Ferroalloy Plant, there is currently a problem with cleaning up spills of charge materials and dust, which leads to shutdowns of process equipment and the involvement of additional personnel. It is necessary to develop a solution for dust aspiration/collection at the facilities of the 4th workshop

Заказчик

ТОО «Business & Technology Services»

Making decisions before ...

до 03.05.24

Область задачи

Other technological solutions

Number of applications

Develop a prototype crawler robot

Conducting inspection and remote monitoring of equipment condition using a crawler robot.

Заказчик

ТОО «Business & Technology Services»

Making decisions before ...

до 03.05.24

Область задачи

Intelligent control systems

Number of applications

Прогнозирование мясной продуктивности КРС с использованием ИИ

Прогнозирование продуктивности КРС, путем анализа данных и определения стандарта породы с оцениванием продуктивности предков

Заказчик

Technology Centers Astana Hub

Making decisions before ...

до 03.04.25

Область задачи

Neurotechnology and artificial Intelligence

Number of applications

Automate manual extraction of ferrochrome from crushed slag in OPShl

It is necessary to automate the manual extraction of fractions 0-5, 5-20, 20-40 mm from crushed stone (slag) in PC № 4, due to the possible loss of metal-containing materials.

Заказчик

ТОО «Business & Technology Services»

Making decisions before ...

до 03.05.24

Область задачи

Other technological solutions

Number of applications